| Specification | |
|---|---|
| Product Name | Prefabricated Steel Structure Duplex House |
| Size | Customized |
| Shipment | 120sqm/40HQ, depend on house layout and materials required |
| Wall | EPS / Rock wool / Fiberglass wool / PU Sandwich Panel |
| Wall Cladding | PVC / PU metal / fiber cement / wooden siding panel |
| Roof | EPS / Rock wool / Fiberglass wool / PU Sandwich Panel |
| Floor | Ceramic tile, laminated floor, wooden floor |
| Window | Aluminum sliding window or customized |
| Door | Single steel door, glass sliding door, composite wood door |
| Assemble days | 4 workers / 40sqm / day |
| Technical Data Sheet | |
|---|---|
| Wind Load | Anti 100KM/H, can be reach to 200km/h if custom |
| Floor Load | 200 KG/㎡ |
| Roof load | 50 KG/㎡ |
| Seismic Load | 7 degree |
Prefab house is a kind of environmental-friendly and economical house with steel frame as the skeleton, sandwich panel as the enclosing material, space combination with standard modular series, bolted connection. It is a easy installation temporary house, and widely used for construction site accommodation, site office, classroom, worker dormitory.
?What is your terms of payment?
30-50% TT for deposit, balance before the shipping or 100% Irrevocable L/C at sight.
?Can you supply the sample?
Yes, we can supply the sample of sandwich panel, house parts. Also all the sample express cost will be refunded after you place the order.
?Is this installation easy?
Yes, our prefab house is easy to install and don’t need to be weld and processed again. We will offer you complete installation drawing and online technical support.
?Can you customize it for us?
We have professional engineer team who will make out a complete solutions according to your job site dimensions and situations.
?What's the delivery time?
Generally, if quantity is less than 3*40 HQ:
1. Portable cabin, will take 30 days.
2. Detachable container house / Flat pack container house, will take 15 days.
3. Prefab worker accommodation, will take 25 days.
4. Steel structure warehouse / workshop, will take 35 days.
5. Sandwich panel, will take 7 days.
?How do you guarantee the quality of the products?
Quality first, 100% strict quality checking before delivery.