Prefab Warehouse Workshop 1000 Square Meter Steel Structure Warehouse Building For The Plant

Product Description

Steel Structure Warehouse
Specification
Prefab Warehouse 1000 Square Meter Steel Structure Warehouse Building For The Plant
Items Specifications
Main structure PEB Welded H-shaped steel or hot rolled steel (Q355 / S355JR, SM490, ASTM A572 or Q235 / ASTM A36)
Anti-rust protection Hot dip galvanized or anti-rust painting
Purlins and girts Cold rolled C or Z steel, Q355 or Q235
Roof and wall Single layer steel sheet or sandwich panel
Gutter Heavy duty galvanized steel
Down pipe PVC
Door Sliding door or roller shutter
Windows PVC or aluminum alloy
Products Description
Advantages of Steel Structure
High Strength
Strong bearing capacity, capable of supporting heavy structural loads.
Lightweight Design
Reduces base and foundation costs while offering excellent seismic performance.
Plasticity & Toughness
Capable of absorbing energy and effectively resisting dynamic loads.
Fast Construction
Prefabricated components shorten construction periods with fast on-site installation.
Flexible & Large Space
Provides large clear spans and flexibility for interior layouts.
Eco-Friendly & Aesthetic
High steel recycling rate minimizes pollution, enabling beautiful and complex architectural designs.
Structure Detail 1
Structure Detail 2
Structure Detail 3
Structure Detail 4
Structure Detail 5
How To Get Quotes

If you have existing structural drawings, please share them with us. Our quotation will be formulated directly from your files. Alternatively, our design team can customize the structural design for your warehouse or workshop.

Please provide the following design criteria for a tailored proposal:
  • 1 Location: Project site country and city.
  • 2 Dimensions: Length * Width * Eave Height (mm).
  • 3 Wind Load: Maximum wind speed (kn/m², km/h, or m/s).
  • 4 Snow Load: Maximum snow height/load (kn/m² or mm) and local temperature ranges.
  • 5 Seismic Rating: Anti-earthquake protection level.
  • 6 Brick Wall Requirement: Is a brick firewall needed? If so, indicate height (e.g., 1.2m, 1.5m).
  • 7 Thermal Insulation: Specify if sandwich panels (EPS, fiberglass, rockwool, PU) or single metal sheets are required.
  • 8 Doors: Quantity and dimensions (width * height in mm).
  • 9 Windows: Quantity and dimensions (width * height in mm).
  • 10 Overhead Cranes: Specify crane units, maximum lifting weight (tons), and lifting height (m) if required.
Warehouse Blueprint Plan
Warehouse Construction Framework
Wall cladding installation
Building structural drawing
Structural details diagram
Erection process representation
Foundation design plan
Joint connection details
Frame structure configuration
Key Advantages of Steel Structure Warehouses & Workshops:
Large Span Design
Maximizes usable interior open area to facilitate streamlined logistics and bulk storage.
Rapid Construction
Pre-engineered components are erected swiftly on-site, cutting labor costs and project schedules.
Reduced Foundation Loads
Lightweight properties mean simpler foundation requirements, translating directly to cost savings.
Seismic Resistance & Durability
High ductility protects structures during seismic events. Specialized coatings resist corrosion for decades.
Finished Warehouse Project
Frequently Asked Questions
Can I schedule a visit to the factory before placing an order?
Absolutely. Factory visits are welcome. We assist in coordinating schedules and local arrangements to facilitate your planning process.
Do you support structural installation services on-site?
Yes. Experienced structural engineers can be dispatched to your location to guide local crews and oversee proper installation of components.
What is the expected lifespan of the main space frame / steel structure?
The design life of the primary structural steel components ranges between 50 to 100 years under normal environmental conditions.
How long will the roof cover coating remain effective?
Standard PE protective coating panels generally provide an operational lifespan of 10 to 25 years before maintenance is required.
What is the standard procedure to cooperate on a custom project?
First, share the project details and basic requirements. We develop initial designs at no charge. After you review and confirm the drawings, contract terms are finalized to begin production.
What are the benefits of prefabricated warehouses over concrete alternatives?
Prefabricated warehouses offer much faster installation times, larger clear span capabilities, superior seismic resilience, and full material recyclability with significantly lower maintenance costs.

Related Products